What Are The Requirements For Site Reconstruction When The Hydraulic Brick Making Machine
2025-6-26 1:02:00 271 times
1. According to the planning map and foundation map provided by the manufacturer, mark the installation site, mark the location of the hydraulic brick machine and other equipment of the production line, and there should be no omission or wrong size;
2. Clean up the sundries on the site, level the land, ensure that the level of the site cannot be too large, and avoid the phenomenon that the equipment cannot be connected after installation;
3. According to the foundation of the hydraulic brick making machine, deal with the places that need to be hardened and dug deep. Due to the heavy weight of the equipment and the shaking of the equipment, the deep excavation part needs to be concreted with a reinforced structure, and the anchor bolts of the equipment should be poured. Fix it into concrete in advance, and ensure the position and levelness of the four anchor bolts;
4. Other parts should also undergo site hardening treatment to ensure that the equipment will not sink during the working process;
5. When the equipment site is rebuilt, drainage and waste recycling should be planned in advance, and the equipment should be installed under the ground as much as possible;
6. For site reconstruction, attention should also be paid to separating the raw material processing equipment from the hydraulic brick machine, so as to avoid the dust generated in the raw material processing process from polluting the hydraulic system and reduce noise pollution;
7. The weight of the hydraulic brick making machine is relatively large. During installation, a crane needs to be used to transport it to the site. The height of the workshop is higher than the height of the equipment. The top of the hydraulic brick machine foundation can be opened, which is convenient for the equipment to be hoisted into the workshop.